Abu-Dhabi Crude Oil Pipeline Project

Posted on September 7, 2016 by admin

Client: International Petroleum Investment Co Year: 2008-2012 The ADCOP project was fast-tracked for completion in 2009 and involved building storage and terminal facilities for the crude export from Fujairah. The crude oil was to be sourced from the onshore Habshan … Continue reading →

Posted in Our Project

Iraq-Ahdeb Oilfield Surface Facilities Project

Posted on September 7, 2016 by admin

Client: Al-WAHA Petroleum Company Ltd Year: 2010-2013 Oil processing system, water supply station, pipeline main station and terminal station with the capacity of Oil: 120,000bpd, Gas: 86MMscf/d. Value: USD$1103.78 million CPECC Scope of Work includes: CPF (Phase I and II): … Continue reading →

Posted in Our Project

Chad Refinery and Oilfield Development

Posted on September 7, 2016 by admin

Client: CNPC International (Chad) Co, Ltd Year: 2009-2011 Refinery, Oilfield Facilities – Chad Value: USD $1.05 Billion CPECC Scope of Work includes: Refinery: Seven sets of major units 1,000,000t/a atmospheric distillation unit 60×104t/a heavy oil catalytic cracking unit 10×104t/a catalytic … Continue reading →

Posted in Our Project

Central Asia Gas Pipeline Project

Posted on September 7, 2016 by admin

Client: Asia Gas Pipeline Limited Liability Partnership Year: 2009-2012 Value: USD $1.4 Billion Pipeline, Storage and Transportation, Compressor Station – Kazakhstan, Uzbekistan CPECC Scope of Work includes: CPECC’s scope of work in CAGP included CS1, CS4, CS6 in Kazakhstan and … Continue reading →

Posted in Our Project

Danndine Expansion and Construction Master Service Agreement

Posted on September 7, 2016 by admin

Client: Arrow Energy – Australia Year: 2014-2017 Surat and Bowen Basin – Domestic Gas Construction Master Service Contract Value: USD$ 65Million CPECC Scope of Work includes: Work Pack 1 Construction of underground pipelines; Work Pack 2 Construction of HV infrastructure … Continue reading →

Posted in Our Project

Domestic Gas Construction Master Service Agreement

Posted on August 29, 2016 by admin

Client: Arrow Energy – Australia Year: 2014-2017 Surat and Bowen Basin – Domestic Gas Construction Master Service Contract Value: USD $30 Million CPECC Scope of Work includes: Work Pack 1 Construction of underground pipelines; Work Pack 2 Construction of HV … Continue reading →

Posted in Our Project
  • The Algeria Skikda Condensate Refinery Project
  • Pakistan White Oil Pipeline Project (WOPP)
  • Abu-Dhabi Crude Oil Pipeline Project
  • Iraq-Ahdeb Oilfield Surface Facilities Project
  • Chad Refinery and Oilfield Development
  • Central Asia Gas Pipeline Project
  • Danndine Expansion and Construction Master Service Agreement
  • Domestic Gas Construction Master Service Agreement
Proudly powered by WordPress