Iraq-Ahdeb Oilfield Surface Facilities Project

project5

Client: Al-WAHA Petroleum Company Ltd

Year: 2010-2013

Oil processing system, water supply station, pipeline main station and terminal station with the capacity of Oil: 120,000bpd, Gas: 86MMscf/d.

Value: USD$1103.78 million

CPECC Scope of Work includes:

  • CPF (Phase I and II): oil processing system phase I: 60,000BOPD, phase II: 60,000BOPD, which included oil processing facilities, level 1 and 2 separators, electric de-water unit, electric desalting unit, 4 heat exchangers, 50,000m3 tank, 10,000m3 tank, one gas process unit, LPG recovery unit, and 2*2000m3 spherical tank, 71MW power station.
  • WS1 (Phase I): 1 water supply station, 5-kilometre water pipeline.
  • WS2 (Phase II): 1 water supply station, 40-kilometre water pipeline.
  • Pipeline (Phase I): 210 kilometre / 24″ export pipeline, main station and terminal station, 80 kilometre CPF to Zubaidia pipeline.
  • FSF (phase I and II): 107 oil wells, 35water inject wells, 9 OGMs, 306-kilometre flow line and truck line, 60-kilometre power transmission line.